Forward counterpart to the audit/remediation system: a DAG-scheduled pipeline that works the planned phases (phases.md) and research questions (research-track.md), with a port-vs-research router, a Theorist/Spec-author (Opus) that derives discrete formulas + designs validation, a research spike→go/no-go gate, an item-type-specific validation strategy (golden oracle / invariant / convergence / cross-library), DAG prerequisite gating (chains A/B), and reuse of the audit system's Integrator/CI/review machinery. The two systems compose into a loop (build forward, audit back). Reciprocal cross-link added to agentic-system-design.md. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
12 KiB
Feature-development agentic system — phases, port & research
Companion to ../reviewer/agentic-system-design.md
(the audit / remediation system). This one is the forward pipeline: it
produces the library — working the planned phases in phases.md,
finishing the Java port, and extending into the research questions in
research-track.md.
The two systems compose into a loop: feature-dev lands new code → the audit system audits & hardens it → findings flow back. Build forward, audit back.
1. Why this needs a different shape than the audit system
The audit pipeline consumes closed, fully-specified findings (file:line, fix,
acceptance). Feature work is the opposite — it is open-ended and gated by truth
sources that differ per item. Three properties of phases.md drive the design:
- Port vs. Research is a hard, explicit fork.
- Port items have a Java golden oracle (e.g.
CPEuclideanFunctional.java,ConesUtility.java) → faithful translation, bit-for-bit parity testing. - Research items have NONE (e.g. inversive-distance, 9b-analytic, Phase 12/13) → derive from papers, design the validation (no oracle exists).
- Port items have a Java golden oracle (e.g.
- Phases form a dependency DAG with hard prerequisites. 10b needs 10a; Phase 13 needs 9c+10a+10b+10c and the holonomy-bug fix. Parallel "chains" exist (Chain A = Phase 12, near-term; Chain B = Phase 13 capstone).
- The hard part is mathematical correctness, not typing. A research item can be numerically wrong while compiling and "converging". Validation must be invented (invariants, convergence studies, cross-library), and a domain expert may need to sign off the discretization.
So this system adds, over the audit one: a DAG-aware scheduler, a port/research router, a spike→go/no-go gate (research may fail), and a validation-strategy designer. It reuses the audit system's Integrator / CI / Review-gate machinery.
2. Roles
| Role | Model | Owns | Output |
|---|---|---|---|
| Roadmap Orchestrator | Sonnet | the phase DAG; picks next unblocked item; runs chains A/B in parallel; classifies port vs research | next-item spec + launch prompt |
| Theorist / Spec-author | Opus | turn a phase into a precise spec: port → extract algorithm + golden values from Java/dissertation; research → read papers, derive the discrete formulas, write the LaTeX note, design the validation | phase-spec doc + doc/math/*-derivation.md |
| Prototyper (Spike) | Opus→Sonnet | a throwaway reference impl (scratch branch) that numerically confirms the math before productionising — the research de-risk | go/no-go + a validated numerical recipe |
| Porter | Sonnet | faithful Java→C++ translation for port items; // Ported from … provenance |
impl + golden-oracle parity tests |
| Research Implementer | Opus→Sonnet | productionise the prototyped research math into the library | impl + tests |
| Validation Engineer | Sonnet | build the test battery appropriate to the item (see §4) | golden / invariant / convergence / cross-lib tests |
| Reviewer (Gatekeeper) | Opus | math-soundness + parity + correctness gate (per item) | APPROVE / CHANGES-REQUESTED |
| Integrator / Release | Sonnet | branch/PR/CI/rebase/merge | merged PR (shared with the audit system) |
| Scholar / Doc | Haiku | references.md rows, math-note polish, user-manual/CLI docs |
docs |
| Human (Domain expert / Owner) | — | research direction; sign off the discretisation; precision-substrate architecture; G0/legal | recorded decision |
The Theorist is the forward mirror of the audit system's Auditor: the Auditor finds problems in existing code; the Theorist produces specs for new code. Both are Opus, because both are "decide what is true / what should be built" work.
3. Workflow (DAG-scheduled, with a research spike gate)
ROADMAP DAG (phases.md + research-track.md; ✅/🔲/⛔/prereqs)
│ Orchestrator picks next item whose prerequisites are ALL ✅
▼
┌── CLASSIFY ──┐
│ port │ research│
└──┬───┴────┬────┘
│ │
│ ▼
│ THEORIST (Opus): derive formulas + LaTeX note + design validation
│ ▼
│ SPIKE (Prototyper): numeric proof-of-correctness on a scratch branch
│ ▼
│ ┌─ GO/NO-GO gate ─┐ NO-GO → record negative result, back to DAG
│ └────────┬────────┘ (research is allowed to fail)
│ │ GO
▼ ▼
PORTER RESEARCH IMPLEMENTER (productionise into the library)
└─────┬──────┘
▼
VALIDATION ENGINEER (battery per §4: oracle / invariant / convergence / cross-lib)
▼
REVIEW GATE (Opus): math-sound? parity intact? public surface intentional?
▼ ── CHANGES-REQUESTED ─► back to implement
INTEGRATE → CI → HUMAN MERGE GATE → MERGE → Orchestrator marks ✅, unblocks dependents
▼
HANDOFF → the AUDIT system re-audits the new module (close the loop)
The spike→go/no-go gate is the key addition: research math is proven cheaply on a throwaway branch before any production code or tests are written. A NO-GO is a successful outcome (a recorded dead end), not a failure — unlike the audit system, where every dispatched finding is expected to land.
4. Validation strategy — chosen by item type
The Theorist picks the battery; the Validation Engineer builds it:
| Item type | Primary oracle | Mandatory checks |
|---|---|---|
| Java port (9a.1, 9c, 9d.1/.3/.4, 9e, 9g, 10a utils) | Java golden values (@golden vectors) |
bit-for-bit parity at the documented tol; FD-gradient check; Gauss–Bonnet |
| Research, has a cross-impl (10a forms ↔ geometry-central; GC-1 cross-check) | another library's output on the same mesh | agreement to tol after normalisation alignment |
| Research, no oracle (inversive-distance, 9b-analytic, 12, 13) | invariants + analytic limits | analytic-limit match (e.g. κ=0 ↔ euclidean path bit-for-bit); invariant conservation (GB, holonomy closure ∏[aᵢ,bᵢ]=Id); FD vs analytic; convergence-under-refinement study |
| Numerical/architecture (high-precision substrate, Hessian speed) | self-consistency | value-identity vs the slow reference; speed-up measured; conditioning diagnostics (the N7 min_ldlt_pivot we just added) |
Two project-specific truths the battery must respect:
- Parity is sacred for ports (the same discipline that kept HardJava the default).
- Precision prerequisite: genus-g composes exponentially-growing isometry products;
doublecannot verify ∏gᵢ=Id. The Theorist must flag when a localised high-precision substrate (cpp_dec_float_50/MPFR) is required (Phase 9c/10c/13), scoped to the uniformisation module only — never the Eigen core.
5. Scheduling the actual roadmap
Chains run in parallel; the Orchestrator never dispatches a blocked item.
- Quick wins first (cheap, unblock confidence): 9g.1 quality measures (Java port, ~3 days, no deps), 9h.1/9h.2 CLI (~hours), 9d.3 stereographic (small). → Porter + Haiku.
- Chain A (near-term research, builds only on landed code): Phase 12 decorated
DCE. → Theorist (decoration reparametrisation) → spike (round-trip
I_ij↔(r,ℓ)+ κ-transition invariant) → Research Implementer → invariant/GB battery. No genus-g deps. - Research math on shipped modules: 9b-analytic HyperIdeal Hessian (Schläfli chain rule) → Theorist + LaTeX note + FD-vs-analytic cross-check against today's block-FD.
- Chain B (gated capstone): the genus-g≥2 spine 9c → 10a(+DEC layer) → 10b → 10c → Phase 13, plus the holonomy-bug fix (Opus + high-precision substrate). The Orchestrator keeps 13 ⛔ until every prerequisite is ✅.
- Blocked by G0 (legal, shared with audit system): Phase 8 CGAL packaging stays ⛔ until porting rights clear — exactly as in the audit plan.
Prerequisite edges are enforced as data: each phase lists its prereqs; the Orchestrator computes the ready-set = {🔲 items whose prereqs are all ✅} each cycle.
6. Composition with the audit system (the loop)
feature-dev: Theorist → spike → implement → validate → review → merge ─┐
│ new module
audit: Auditor → plan → (implement → review) → integrate → merge ┘ hardened
▲ │
└────────────────── re-audit the new module ◄────────────────────┘
- Shared infrastructure: Integrator, CI/Infra-Diagnostician, Review-gate discipline, the blackboard (markdown + git), commit-attribution by model.
- Distinct front-ends: Auditor (finds problems) vs Theorist (specs features).
- The handoff: every feature merge triggers an audit-backlog entry "audit module X", so growth never outruns scrutiny.
7. Run options (same ladder as the audit system)
- Manual sessions — Orchestrator emits a launch prompt per item (a forward analog
of
session-prompts.md), set to the named model; spike + review are separate Opus sessions. - Claude Code subagents — roles as subagents with pinned models and scoped tools
(Prototyper works only on
spike/**branches; Porter cannot touchdoc/mathproofs; Reviewer is read-only onmain). - Claude Agent SDK — a supervisor loops the DAG: computes the ready-set, spawns the role-agents, runs gates as code (build/test/CI + invariant checks), and stops at the go/no-go and human-sign-off gates.
8. Failure modes this design absorbs
- Research math is wrong → caught at the cheap spike gate before production code.
- A port drifts from Java → golden-oracle parity tests (Porter's mandatory battery).
- "Converges" but is geometrically false → invariant checks (GB, holonomy closure)
and convergence-under-refinement, not just
‖G‖<tol. - A capstone is started prematurely → DAG scheduler refuses blocked items (Phase 13).
doublesilently fails the group relation → Theorist's precision-prerequisite flag forces the localised high-precision substrate.- New code outruns review → the audit-system handoff re-audits every merged module.
9. Worked first move (concrete, startable today)
Item: Phase 9g.1 conformal-quality measures — Java port, no new theory, no deps, ~3 days. Why first: lands fast, strengthens the validation story for the already- shipped genus-0/1 pipeline, and exercises the whole forward pipeline cheaply.
- Orchestrator → classify port; prereqs none → ready.
- Porter (Sonnet) → translate IsothermicityMeasure / DCE-measure / FlippedTriangles /
LengthCrossRatio + the ConvergenceUtility metrics into
conformal_quality.hpp,// Ported from …provenance. - Validation (Sonnet) → golden values from the Java outputs + a flipped-triangle unit case; reuse on cathead/brezel.
- Reviewer (Opus) → parity + the length-cross-ratio definition vs Springborn-Schröder- Pinkall 2008.
- Scholar (Haiku) →
references.mdrow + a line invalidation.md. - Integrator → PR,
/test-cgal+/quality-gatesrun, merge → audit handoff.
Then open Chain A / Phase 12 in parallel as the first research exercise of the spike gate.